Update 1.1
Small update
Cleaned up signs and taxiways that were incorrect
Redesignated gates as ramps so that airstairs works
Adjusted glideslope on both 13 and 31.
Added an exclusion rectangle over where cruise terminal would be to see if that will help those with 3rd party scenery problems (not sure what it does if anything)
Removed building from threshold of rwy13 in standard scenery.
Update 1.3
Another small update
Corrected taxiway sign errors
Adjusted runway 13 glideslope
Added Approach for runway 13 from Cheung Chau VOR over the current HK intl toward the Checkerboard
Unfortunately the ILS frequency still has to be added manually in the FMC NAV/RAD
Freq: 111.9 course 88
Added delete existing airport element to XML
- Version 3.1 April 21, 2022
Update to IGS approach lights to be more realistic
Removed and replaced problematic Taxi model from the airport entrance
Texture Changes and small fixes- Version 3.0 February 16, 2022
- Version 2.1.1 January 16, 2022
Update Includes
Various lighting modifications
Custom Shuttle Bus now added to gates replacing stock Asobo bus.
modified IGS for a slightly lower approach for the right turn.
various texture changes
numerous small tweaks- Version 2.1 December 10, 2021
Nav Data added
The long-promised SID and STARS have now been added natively as well as correctly programing the IGS and ILS for runways 13 and 31 respectively. you no longer have to manually add the ILG/IGS frequency in the FMC.
I will try to add the SC NDB approach at a later date.
Modified lead-in lights.
removed items left missed in the last update
Charts for VHHX can be found at IVAO East Region
https://xe.ivao.aero/- Version 2.0.1 December 03, 2021
Minor update to last weeks release
Added the Cheung Chau VOR directly as this might of been causing CTD problems
Removed some old Asobo models as they were causing errors
Altered the position of lights and other models incorrectly placed
Modified some models to help performance.- Version 2.0 November 25, 2021
After many months of work version, 2.0 is here!
This was a near-complete rebuild of the entire airport (still a lot more to do)
New leadin approach light system.
90% of the buildings have been re-modelled and textured; this Includes the cargo building, maintenance hangers, fire stations and partial passenger terminal interior.
Well known Kai Tak advertising billboards included at the threshold of rwy13
New checkerboard.
Custom Apron lights.
Airfield height was raised to the correct height.
Road traffic driving across the runway and apron has been stopped.
the majority of random lights have now been removed. (a couple do remain, unknown why)
Signage and markings improved
I have not had time to add all SIDs and stars yet, (current file causes CTD so have not included it)