Having time this last weekend allowed me to work on the Aeronca K a bit more.
Work consisted of adding the access holes (maintenance) and other parts to the under side of the wings and aft-left fuse. I also flared our the landing struts to the cowl area which was a small task in itself. Also added were the door/window frames.
I'm posting a link to the image due to it's size. http://img10.imageshack.us/img10/4522/qeor.png
Work continues as I get time.
Work consisted of adding the access holes (maintenance) and other parts to the under side of the wings and aft-left fuse. I also flared our the landing struts to the cowl area which was a small task in itself. Also added were the door/window frames.
I'm posting a link to the image due to it's size. http://img10.imageshack.us/img10/4522/qeor.png
Work continues as I get time.