Eras 3 & 5 are finished.
I don't know, there is still a lot of work to do. I'm finishing era 4 at the moment but it is long.
I'm doing a lot of facilities for D Day beaches only for one mission, the attack of ZG 1 near Caen in the afternoon of 6th of june.
Then, I'll build a Jedburgh team drop in Brittany in august 1944 but it will take some time as I have several ideas for a new concept but it will require some boring spawn setup.
Once it is done, I have to do missions for eras 1 and 2.
If the He177 is released, I have informations for two missions.
So, I think, no release before august or september.