Work in progress...KSDL

paiken

SOH-CM-2023
Finally have some free time available to work on the project. Texturing has been a real bear, but I think I'm finally getting a grip on it. The airport itself is only about 30% complete at this point, but I have several more buildings modeled and ready for texturing.
Pat
 
Back
Top